Previous Projects

PREVIOUS KEY PROJECTS

The Fuel Stations

Supply materials, design, fabrication and installation for the fuel stations (Turn-Key Basis).Total : (33) Stations in Myanmar.

Myanmar Ivanhoe Copper Co., Ltd.

Material supplier, steel fabricator and M&E installation contractor of Myanmar Ivanhoe Copper Co., Ltd. (Monywa Copper Mine Site) ? Fabrication, sand blasting & airless spray painting of mild steel sulphuric acid pressure vessel with frame and pressure relief valve Capacity : 11000 Liters (20.13 MT), Diameter : 1650 mm (2001)? Fabrication of Mild steel sumps & tanks including blasting & painting...

The Governor Residence

Major renovation project (2007).